This project executed in Kerman province, Jeyroft city, at the downstream of Jiroft dam's power plant.
The specifications of this project are as follow:
• Embankment volume: 450,000 cubic meters
• Excavation volume: 750,000 cubic meters
• Concrete; 130,000 cubic meters
• Construction of wall with concrete and sand stone: 150,000 cubic meters
• The height of the Spillway crest from the foundation: 85.8 meters
• Reservoir capacity: 550,000 cubic meters
Client : Kerman Water Authority
Consultant : Halil Ab Company
Start Date: 1992
End Date: 1997
View the embedded image gallery online at:
http://www.ahabco.ir/en/projects/120-executed-projects/dam-construction/340-jiroft-diversion-dam.html#sigProIda5ea3c8d66
http://www.ahabco.ir/en/projects/120-executed-projects/dam-construction/340-jiroft-diversion-dam.html#sigProIda5ea3c8d66